Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/2025/08/request-for-general-contractor-prequalification-submittals-bostian-hall-roof-replacement/ | |||
Project Name | Bostian Hall - Roof Replacement | |||
Prequalifying for | North Carolina State University is seeking qualification
statements from general contractors for improvements to the
Bostian Hall Roof Replacement, located on Main Campus. The
project scope includes the replacement of the existing
17,113 sf IRMA and EPDM roof systems with a new single-ply
roof system for this three-story, 44,000 sf building,
originally constructed in 1980. The existing roof system
will remain in service until the new system is installed.
To qualify, the contractor must have a general
contractor's license in the State of North Carolina as
well as applicable bonding requirements. The contractor
must show comparable work experience, both in complexity and
dollar value, and preferably in a university campus
environment, to the scope of work outlined above. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | REI Engineering, Inc | |||
Design Firm Contact Name | Ron McKaskel | |||
Design Firm Telephone Number | (919) 845-1450 Ext: 126 | |||
Design Firm Email | rmckaskel@reiengineers.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | ||||
Campus Contact Email | DC_Formal_Prequal@ncsu.edu | |||
Due Date | 09/26/2025 | |||
Due Time | 4:00 pm | |||
Submit To | To be considered, the contractor must obtain an application
package from the NC State University Project Manager and
submit a fully completed qualification document by 4:00 pm,
9/26/25, to Don Ferree, P. E., project manager, by email
only to DC_Formal_Prequal@ncsu.edu. No hard copies will be
accepted. Application packages will be available
electronically after 8/25/25. Please contact the project
manager via email (preferred) or phone to request a package
or download it from the link below.
NOTE: The SCO Prequalification Package has been updated
recently. Please use the project-specific form provided by
NC State at the link below. Submissions on any other form
will be considered nonresponsive.
NC State University has an affirmative policy of fostering,
promoting, and conducting business with women and minority
owned enterprises. Women and minority contractors are
encouraged to participate in the prequalification process. |