Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | Steam Phase VIIIB - Dabney Hall Leg | |||
Prequalifying for | This project is seeking qualified general contractors who
can install pressurized pipe in a tunnel setting. The
project includes asbestos abatement, demolition of existing
low pressure steam, high pressure steam, and condensate
lines and the installation of new high pressure steam and
pumped condensate pipes in the NC State steam tunnels. It
also involves the installation of two pressure relief valves
and connection to the associated utilities in the Dabney
Hall mechanical space. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | RMF Engineering | |||
Design Firm Contact Name | Greg Carnathan | |||
Design Firm Telephone Number | (919) 941-9876 | |||
Design Firm Email | greg.carnathan@rmf.com | |||
CM at Risk Firm Name | Not Applicable | |||
CM at Risk Firm Email | Not Applicable | |||
Campus Contact Email | srbostia@ncsu.edu | |||
Due Date | 04/22/2016 | |||
Due Time | 5:00 pm | |||
Submit To | Steven R. Bostian, PE
NC State University
Capital Project Management
Administrative Services III Building Suite 331
2701 Sullivan Drive
Raleigh, NC 27695-7520
Please refer to the detailed advertisement on the NC State
webpage for more information. The pre-qualification package
can be obtained by emailing the NCSU project manager and
requesting the Word file. All pre-qualification packages
must be submitted prior to April 22, 2016 at 5 PM. No
electronic copies will be accepted. |