 Project Name Steam Phase VIIIB - Dabney Hall Leg 
 Prequalifying for 
This project is seeking qualified general contractors who can install pressurized pipe in a tunnel setting. The project includes asbestos abatement, demolition of existing low pressure steam, high pressure steam, and condensate lines and the installation of new high pressure steam and pumped condensate pipes in the NC State steam tunnels. It also involves the installation of two pressure relief valves and connection to the associated utilities in the Dabney Hall mechanical space.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm RMF Engineering 
 Design Firm Contact Name Greg Carnathan 
 Design Firm Telephone Number (919) 941-9876 
 Design Firm Email greg.carnathan@rmf.com 
 CM at Risk Firm Name Not Applicable 
 CM at Risk Firm Email Not Applicable 
 Campus Contact Email srbostia@ncsu.edu 
 Due Date 04/22/2016 
 Due Time 5:00 pm 
 Submit To 
Steven R. Bostian, PE NC State University Capital Project Management Administrative Services III Building Suite 331 2701 Sullivan Drive Raleigh, NC 27695-7520 Please refer to the detailed advertisement on the NC State webpage for more information. The pre-qualification package can be obtained by emailing the NCSU project manager and requesting the Word file. All pre-qualification packages must be submitted prior to April 22, 2016 at 5 PM. No electronic copies will be accepted.