Designer Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | http://www.ncsu.edu/facilities/advertisements/index.htm | |||||
Project Name | Winston Hall HVAC Renovations | |||||
Type of Services | Mechanical Engineering | |||||
Project Manager | Steven R. Bostian, PE | |||||
Phone Number | (919) 515-8059 | |||||
Contact Email | srbostia@ncsu.edu | |||||
Closing Date | 07/25/2014 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences The existing heating system consists of perimeter hot water
finned tube heaters (radiators). This project will replace
the radiators with hot water reheat coils at new terminal
units. This project will remove the existing terminal
radiant heaters along the perimeter of the building and all
associated supports, controls, and accessories. The existing
hot water piping may then be renovated or replaced based on
an evaluation of the existing system by the selected
designer and the University stakeholder. This modified or
new piping will then provide heating hot water to a new VAV
system with new direct digital controls | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) A pre-submittal meeting will be conducted at 10 AM on July
10, 2014 at 2701 Sullivan Drive in Admin Services III
Conference Room 301 to review the project and answer any
questions. Attendance is not mandatory but highly
recommended.
Submit qualification documents to:
Steven R. Bostian, PE
NC State University
Capital Project Management
2701 Sullivan Drive Suite 331
Raleigh, NC 27695-7520
Electronic documents will not be accepted. All documents
must be received by 5 PM on July 25,2014. |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.