Construction Bids
Full Details
Institution | NC Arboretum | |||||
Institution URL for Additional Information about this Project (Optional) | https://www.ncarboretum.org/wp-content/uploads/2025/06/TNCA-Greenhouse-Boiler-Controls-Replacement-Bid-Advertisement.pdf | |||||
Project Name | Greenhouse Boiler Replacement | |||||
Name of Design Firm | DeVita & Associates, Inc. | |||||
Design Firm Contact Name | Keith Connor | |||||
Design Firm Telephone Number | (980) 312-5301 | |||||
Design Firm Email | kconnor@devitainc.com | |||||
Campus Contact Email | Stephanie Lee | |||||
Pre-Bid Date | 07/17/2025 | |||||
Pre-Bid Time | 1:00 pm | |||||
Bid Date | 07/31/2025 (Date Bids Will Be Opened) | |||||
Bid Time | 2:00 pm (Time Bids Will Be Opened) | |||||
Bid Location | The North Carolina Arboretum
100 Frederick Law Olmsted Way
Asheville, NC 28806 | |||||
Plan Deposit |
Complete plans and specifications may be obtained from the Designer during normal office hours. |