Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution NC State University 
 Institution URL for Additional
Information about this Project (Optional)
 https://facilities.ofa.ncsu.edu/2024/03/lighting-conversion-cvm-main-building-phase-1/ 
 Project Name LED Conversion - CVM Main Building Phase 1 
 Prequalifying for 
Within the CVM Main building, this project will convert the existing lighting to LED for energy savings. Existing fixtures will either be retrofitted or replaced. Approximately 43,650 square feet of the building will be included with this phase of the project. This square footage consists primarily of hallways and stairwells. Parts of the building may be occupied during construction, and some night/weekend work may be necessary.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm SKA Consulting Engineers 
 Design Firm Contact Name Kenzie Oakes 
 Design Firm Telephone Number  
 Design Firm Email KMOakes@skaeng.com 
 CM at Risk Firm Name  
 CM at Risk Firm Email jlpfeif2@ncsu.edu 
 Campus Contact Email jlpfeif2@ncsu.edu 
 Due Date 04/10/2024 
 Due Time 5:00 pm 
 Submit To 
DC_Formal_Prequal@ncsu.edu (electronic format only)