Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/2024/03/lighting-conversion-cvm-main-building-phase-1/ | |||
Project Name | LED Conversion - CVM Main Building Phase 1 | |||
Prequalifying for | Within the CVM Main building, this project will convert the
existing lighting to LED for energy savings. Existing
fixtures will either be retrofitted or replaced.
Approximately 43,650 square feet of the building will be
included with this phase of the project. This square
footage consists primarily of hallways and stairwells.
Parts of the building may be occupied during construction,
and some night/weekend work may be necessary. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | SKA Consulting Engineers | |||
Design Firm Contact Name | Kenzie Oakes | |||
Design Firm Telephone Number | ||||
Design Firm Email | KMOakes@skaeng.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | jlpfeif2@ncsu.edu | |||
Campus Contact Email | jlpfeif2@ncsu.edu | |||
Due Date | 04/10/2024 | |||
Due Time | 5:00 pm | |||
Submit To | DC_Formal_Prequal@ncsu.edu
(electronic format only) |