Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | Apiculture Facility | |||
Prequalifying for | North Carolina State University is seeking qualification
statements from general contractors for improvements to
Apiculture Facility, located on Lake Wheeler Campus. The
project scope includes the construction of a new
5,000-square-foot Apiculture Facility at the Lake Wheeler Rd
Field Labs. The project will include the demolition of the
failing existing Bee Research Lab. The new facility will
include offices, a meeting room, labs and workshops.
To be considered, the contractor must obtain an application
package from the NC State University Project Manager and
submit a fully completed qualification document by 5:00pm,
March 29, 2024, to Melissa Diamond, project manager, by
email only to DC_Formal_Prequal@ncsu.edu.
No hard copies will be accepted. Please contact the project
manager via email (preferred) or phone to request a package
or download it from the link above. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Biloba Architecture | |||
Design Firm Contact Name | Ian Patrick | |||
Design Firm Telephone Number | (704) 248-2922 | |||
Design Firm Email | ianpatrick@biloba.co | |||
CM at Risk Firm Name | N/A | |||
CM at Risk Firm Email | N/A | |||
Campus Contact Email | mrdiamon@ncsu.edu | |||
Due Date | 03/28/2024 | |||
Due Time | 5:00 pm | |||
Submit To | Responses will be received by email only to
DC_Formal_Prequal@ncsu.edu. |