Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/2023/02/request-for-general-contractor-prequalification-submittals-north-central-campus-domestic-water-line-replacemen | |||
Project Name | North & Central Campus - Domestic Water Line Replacement | |||
Prequalifying for | This multi-phased project replaces sections of 1950s and
1960s vintage failing domestic water lines across campus.
The existing deteriorating water lines are made of asbestos
cement or cast iron piping. The project shall improve campus
resiliency in a fire event, improve campus water pressure,
and save costs associated with the increased frequency of
large campus water leaks in recent years. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | RMF Engineering | |||
Design Firm Contact Name | Matt Boatwright | |||
Design Firm Telephone Number | (919) 941-9876 | |||
Design Firm Email | matthew.boatwright@rfm.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | ||||
Campus Contact Email | david_hammock@ncsu.edu | |||
Due Date | 03/13/2023 | |||
Due Time | 5:00 pm | |||
Submit To | Submit a fully completed qualification document by 5:00 pm,
March 13, 2023, to David Hammock, project manager, by email
only to david_hammock@ncsu.edu. No hard copies will be
accepted. |