Institution | UNC - Chapel Hill Academic Affairs | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.unc.edu/ | |||
Project Name | S-1 Parking Deck | |||
Prequalifying for | Frank L. Blum Construction and TA Loving (BLUM-LOVING), a
joint venture has been selected as the Construction Manager
@ Risk by the University of North Carolina and the UNC
Medical Center and is seeking to pre-qualify construction
trade and specialty contractors to submit bid for furnishing
labor, materials, equipment and tools for Package #1 of the
UNC S-1 Parking Deck and Central Generator Plant/Electrical
Modernization project in Chapel Hill, NC.
PROJECT DESCRIPTION: The proposed UNC S-1 Parking Deck
is being planned in conjunction with a new Central Generator
Plant and Electrical Modernization project for the UNC
Medical Center (see SCO project #18-19904-01A). The combined
project will be located on the existing UNC S-1 surface
parking lot and is anticipated that the deck will provide a
minimum of 450 parking spaces. The UNCMC CGP/Electrical
Modernization project has been undertaken to provide new
emergency power supply system, appropriately sized to serve
the full electrical requirements for UNC Hospitals. This
system will include a new Central Generator Plant (CGP),
fuel storage facility, underground electrical distribution
to main electrical rooms and renovation of existing
electrical rooms within the Hospital to meet new code
requirements.
At this time we are seeking prequalification's for
Package #1 -structural demolition & abatement, site
electrical work, main plant equipment, site work, early
concrete work and site utilities.
Principal trade and specialty contractors are solicited for
the following bid packages:
Bid Package Bid Package Description Preliminary Budget
BP02-PH0100-0200 Structural Demolition and
Abatement $85,000
BP01-PH0400-2600 Site Electrical (excludes
equipment) $400,000
BP02-PH2000-2630 Main Plant Equipment $4,600,000
BP01-PH0300-3400 Site work, Erosion Control, Storm
Drainage $1,300,000
BP02-PH2000-0300 Early Concrete $500,000
BP01-PH0400-3300 Site Utilities (Water, Sewer, Chilled
Water) $2,500,000
Additional packages may be added and deleted by the Owner
and Construction Manager.
T.A. Loving/Blum Construction has a long-standing commitment
to maximize minority and other HUB participation on all of
our projects, and we recognize the importance the University
of North Carolina places on minority and HUB participation
for all of their projects. Our goal is to achieve a minimum
of 10% minority participation on this project.
Prequalification forms can be obtained from our online plan
room http://www.flblum.com/subcontractors.php. Completed
prequalification forms should be submitted to Kari Hiatt by
November 15, 2019 via email (khiatt@flblum.com) or mail (830
NE 25th St., Winston-Salem, NC 27105). Target bid date is
January 2020. | |||
Main Contact for Submission | CM at Risk Firm | |||
Name of Design Firm | ClarkNexsen | |||
Design Firm Contact Name | Shann Rushing | |||
Design Firm Telephone Number | (919) 576-2049 | |||
Design Firm Email | srushing@clarknexsen.com | |||
CM at Risk Firm Name | T.A. Loving/ Blum Construction | |||
CM at Risk Firm Email | khiatt@flblum.com | |||
Campus Contact Email | nathan.harms@fac.unc.edu | |||
Due Date | 11/15/2019 | |||
Due Time | 5:00 pm | |||
Submit To | Prequalification forms can be obtained from our online plan
room http://www.flblum.com/subcontractors.php. Completed
prequalification forms should be submitted to Kari Hiatt by
November 15, 2019 via email (khiatt@flblum.com) or mail (830
NE 25th St., Winston-Salem, NC 27105). Target bid date is
January 2020. |