 Institution UNC - Chapel Hill Academic Affairs 
 Institution URL for Additional
Information about this Project (Optional)
 https://facilities.unc.edu/ 
 Project Name S-1 Parking Deck 
 Prequalifying for 
Frank L. Blum Construction and TA Loving (BLUM-LOVING), a joint venture has been selected as the Construction Manager @ Risk by the University of North Carolina and the UNC Medical Center and is seeking to pre-qualify construction trade and specialty contractors to submit bid for furnishing labor, materials, equipment and tools for Package #1 of the UNC S-1 Parking Deck and Central Generator Plant/Electrical Modernization project in Chapel Hill, NC. PROJECT DESCRIPTION: The proposed UNC S-1 Parking Deck is being planned in conjunction with a new Central Generator Plant and Electrical Modernization project for the UNC Medical Center (see SCO project #18-19904-01A). The combined project will be located on the existing UNC S-1 surface parking lot and is anticipated that the deck will provide a minimum of 450 parking spaces. The UNCMC CGP/Electrical Modernization project has been undertaken to provide new emergency power supply system, appropriately sized to serve the full electrical requirements for UNC Hospitals. This system will include a new Central Generator Plant (CGP), fuel storage facility, underground electrical distribution to main electrical rooms and renovation of existing electrical rooms within the Hospital to meet new code requirements. At this time we are seeking prequalification's for Package #1 -structural demolition & abatement, site electrical work, main plant equipment, site work, early concrete work and site utilities. Principal trade and specialty contractors are solicited for the following bid packages: Bid Package Bid Package Description Preliminary Budget BP02-PH0100-0200 Structural Demolition and Abatement $85,000 BP01-PH0400-2600 Site Electrical (excludes equipment) $400,000 BP02-PH2000-2630 Main Plant Equipment $4,600,000 BP01-PH0300-3400 Site work, Erosion Control, Storm Drainage $1,300,000 BP02-PH2000-0300 Early Concrete $500,000 BP01-PH0400-3300 Site Utilities (Water, Sewer, Chilled Water) $2,500,000 Additional packages may be added and deleted by the Owner and Construction Manager. T.A. Loving/Blum Construction has a long-standing commitment to maximize minority and other HUB participation on all of our projects, and we recognize the importance the University of North Carolina places on minority and HUB participation for all of their projects. Our goal is to achieve a minimum of 10% minority participation on this project. Prequalification forms can be obtained from our online plan room http://www.flblum.com/subcontractors.php. Completed prequalification forms should be submitted to Kari Hiatt by November 15, 2019 via email (khiatt@flblum.com) or mail (830 NE 25th St., Winston-Salem, NC 27105). Target bid date is January 2020.
 
 Main Contact for Submission CM at Risk Firm 
 Name of Design Firm ClarkNexsen 
 Design Firm Contact Name Shann Rushing 
 Design Firm Telephone Number (919) 576-2049 
 Design Firm Email srushing@clarknexsen.com 
 CM at Risk Firm Name T.A. Loving/ Blum Construction 
 CM at Risk Firm Email khiatt@flblum.com 
 Campus Contact Email nathan.harms@fac.unc.edu 
 Due Date 11/15/2019 
 Due Time 5:00 pm 
 Submit To 
Prequalification forms can be obtained from our online plan room http://www.flblum.com/subcontractors.php. Completed prequalification forms should be submitted to Kari Hiatt by November 15, 2019 via email (khiatt@flblum.com) or mail (830 NE 25th St., Winston-Salem, NC 27105). Target bid date is January 2020.