Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | Winston Hall HVAC Renovations | |||
Prequalifying for | The general contractor shall remove the existing cooling
only air handlers, shut-off VAV boxes, baseboard radiant
heaters, pneumatic controls, steam to hot water converter,
hot water pump, and other associated piping and equipment.
The contractor shall then install new heating and cooling
air handlers, reheat VAV boxes, steam to hot water
converter, hot water pump, building automation system,
connection to the campus automation system, and other
piping, mechanical, and electrical components. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Apogee Consulting Group | |||
Design Firm Contact Name | John Mathews | |||
Design Firm Telephone Number | (919) 838-7628 | |||
Design Firm Email | jmathews@acg-pa.com | |||
CM at Risk Firm Name | Not Applicable | |||
CM at Risk Firm Email | Not Applicable | |||
Campus Contact Email | Steven R. Bostian | |||
Due Date | 08/13/2015 | |||
Due Time | 5:00 pm | |||
Submit To | Steven R. Bostian, PE
NC State University
Capital Project Management
2701 Sullivan Drive
Suite 331
Raleigh, NC 27695
Please contact Steve Bostian at srbostia@ncsu.edu to request
a general contractor pre-qualification package.
Only one (1) pre-qualification package is required. The
pre-qualification package must be received by 5 PM on August
13, 2015 to be considered. No electronic packages will be
considered. |