Designer Solicitations
Full Details
Institution | UNC Asheville | |||||
Institution URL for Additional Information about this Project (Optional) | https://tinyurl.com/mr6ux5rr | |||||
Project Name | Belk Theatre HVAC Retrofit Project | |||||
Type of Services | Mechanical Engineering | |||||
Project Manager | Dan Croisant | |||||
Phone Number | (828) 251-6564 | |||||
Contact Email | mpohl@unca.edu | |||||
Closing Date | 04/05/2024 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Belk Theatre is a 10,715 GSF arena theatre constructed in
1976. It contains a 199-seat theatre, box office, scene and
costume shop, and the department's main office. The
last mechanical component upgrade occurred in 2005. The
scope of this project is to replace the existing HVAC system
serving this building with a new high efficiency system,
providing cooling and heating without the use of natural gas
as a primary fuel source. The use of natural gas will be
considered as a secondary/backup heating source only.
Special consideration shall be given to zoning of areas with
highly variable occupant loads and dehumidification of
costume storage areas. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Mary Pohl
Administrative and Program Associate HUB Coordinator
Campus Operations
University of North Carolina Asheville
828 250-3994
mpohl@unca.edu |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.