Designer Solicitations
Full Details
Institution | UNC Charlotte | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.charlotte.edu/our-services/business-related-services/capital-projects/business-opportunities/advertisements/atkins-library-tower-ad | |||||
Project Name | Atkins Library Tower ADA & Fire Smoke System Upgrades Commissioning | |||||
Type of Services | Commissioning | |||||
Project Manager | Attila Gergely | |||||
Phone Number | ||||||
Contact Email | agergel1@uncc.edu | |||||
Closing Date | 02/16/2023 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Submittals are due by 2:00 p.m., Thursday, February 16,
2023
The ADA scope will include: enlarging the two existing
elevator shafts and replacing the elevators to meet ADA
requirements, renovating the existing tower restrooms to
meet building code and ADA requirements, replacing finishes
to include paint and carpet for areas disturbed by the
project improvements, and upgrading
telecommunications/electrical/HVAC equipment as required for
the ADA improvements. The fire/smoke system upgrades scope
will include: repairs and replacement of components
associated with the buildings atrium and high-rise smoke
control system, establishing a sequence of operations for
the full building smoke control system, ensuring the
complete building smoke control system operates as a single
system, replacing or removing any failed or extraneous
equipment, upgrading the dry valve in G76 which serves the
dry sprinkler system at the loading dock, and replacing the
fire pump controller. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Attila Gergely
Facilities Management
University of North Carolina at Charlotte - Building 55
9151 Cameron Blvd
Charlotte NC 28223 |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.