| Project Description | | One-Two Sentences
During a recent project to replace vacuum pumps at the
School of Dentistry, it was discovered that there is
widespread clogging and corrosion of vacuum piping in three
buildings at the School of Dentistry - Brauer, Tarrson, and
First Dental. The vacuum system in these buildings serves
330 operatories. The blockages within the piping contain
mercury from dental amalgam and shall be handled as
hazardous material. This project scope of work includes
design to replace the dental vacuum piping including the
abatement of hazardous materials, as well as design for bulk
amalgam separators in Brauer, Tarrson and Koury. The Koury
vacuum system serves 85 simulation benches.
Design Services shall include: Architecture, Mechanical,
Electrical, Plumbing, Fire Protection, and HazMat Abatement.
The design team shall prepare SD, DD, and CD level Contract
Documentation to include Life-cycle Cost Analysis, Phasing
Plans and Project Budget Cost Analysis.
The design team may be led by an Architectural or an
Engineering firm. Given the complexities of design and
construction for renovation projects and the expectation of
maintaining an operational environment for the Users, the
University requests that as part of the submittal the design
team indicate their Proposed Approach to both Field
Verification and Project Phasing.
This solicitation extends the opening date of the previous
solicitation for this project. | |