Designer Solicitations
Full Details
Institution | UNC Charlotte | |||||
Institution URL for Additional Information about this Project (Optional) | http://facilities.uncc.edu/advertisements | |||||
Project Name | Campus Infrastructure Renewal (Atkins) | |||||
Type of Services | Engineering | |||||
Project Manager | Tom Bastian | |||||
Phone Number | (704) 687-0528 | |||||
Contact Email | tbastian@uncc.edu | |||||
Closing Date | 04/09/2015 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Design the HVAC system and lighting on 5th thru 8th floors
of Atkins including portions of the 9th and 10th floors to
improve the protection of the library collection; improve
comfort and indoor air quality; energy conservation; and
meet IES lighting standards. The work will include overhaul
of the built-up penthouse air handling unit including the
installation of variable frequency drives, dehumidification
control, pre-heat and economizer controls, re-piping steam
humidifiers, and digital controls. Terminal boxes will be
replaced and DDC controls added. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Joyce Clay
University of North Carolina at Charlotte
Capital Projects
Facilities Management
9201 University City Boulevard
Charlotte, N.C. 28223-0001
Or hand delivered to:
Attn: Joyce Clay
Facilities Management/Police Building, 2nd Floor - Capital
Projects
9151 Cameron Blvd.
(Building #55 on the campus map) |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.