Construction Manager-at-Risk Solicitations
Full Details
Institution | Fayetteville State University | |||||
Institution URL for Additional Information about this Project (Optional) | https://www.uncfsu.edu/faculty-and-staff/divisions-departments-and-offices/division-of-business-and-finance/facilities-management/fmpc | |||||
Project Name | Campus Wide Utilities Infrastructure | |||||
Project Manager | Harold Miller | |||||
Phone Number | (910) 672-1952 | |||||
Contact Email | hmiller1@uncfsu.edu | |||||
Pre-proposal Date | 01/25/2024 | |||||
Pre-proposal Time | 11:00 am | |||||
Pre-proposal Location | FSU - Facilities Management Office - Conference Room 1200 Murchison Road, Fayetteville, NC | |||||
Closing Date | 02/05/2024 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Fayetteville State University is accepting proposals for a
Construction Manager at Risk for the Campus Wide Utilities
Infrastructure Projects until 5:00 pm on February 5, 2024,
via Electronic submission. All responses should be delivered
electronically in PDF format via email to Harold Miller at
hmiller1@uncfsu.edu. Hard copies are not requested or
required for this solicitation.
This Utility Infrastructure Repair project includes the most
pressing and critical improvements to three FSU-owned
underground utility infrastructure systems: the medium
voltage (12.47 kV) electrical distribution system, the
stormwater sewer and natural gas distribution system. The
majority of the MV electrical system is 25-30 years old.
Nearly 90% of this project cost is dedicated to that MV
electrical system, replacing the 25-30 year old cabling,
pad-mounted switches and transformers, and metal enclosed
switchgear. There are several failed/collapsed sections of
stormwater drainage system that will be the focus of that
stormwater repair work. Some old buried, corroded, and
leaking metal natural gas piping will be replaced with new
plastic piping, and some failed shutoff valves will be
replaced. An update of the campus utility infrastructure
maps and electrical and natural gas submetering is included
in the project scope.
Proposers who attended the preproposal conference on January
16 are not required to attend on January 25. | |||||
Submit To | Electronic submissions should be sent to hmiller1@uncfsu.edu
and must be received by 5:00 P.M. on Monday, February 5,
2024. Project Manager Harold Miller can be reached at the
above email address and at 910-672-1952. |