Construction Manager-at-Risk Solicitations
Full Details
Institution | UNC Charlotte | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.charlotte.edu/our-services/business-related-services/capital-projects/business-opportunities/advertisements/atkins-library-tower-ad | |||||
Project Name | Atkins Library Tower ADA and Fire/Smoke System Upgrades | |||||
Project Manager | Attila Gergely | |||||
Phone Number | (704) 687-0522 | |||||
Contact Email | agergel1@uncc.edu | |||||
Pre-proposal Date | 10/12/2022 | |||||
Pre-proposal Time | 11:00 am | |||||
Pre-proposal Location | Atkins Library- Room 271 | |||||
Closing Date | 11/08/2022 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences The ADA project will include: enlarging the two existing
elevator shafts and replacing the elevators to meet ADA
requirements, renovating the existing tower restrooms to
meet building code and ADA requirements (including
increasing the number of plumbing fixtures), replacing
finishes to include paint and carpet for areas disturbed by
the project improvements, and upgrading
telecommunications/electrical/HVAC equipment as required for
the ADA improvements.
The fire/smoke system upgrades project will include: repairs
and replacement of components associated with the buildings
atrium and high-rise smoke control system, establishing a
sequence of operations for the full building smoke control
system, ensuring the complete building smoke control system
operates as a single system, replacing or removing any
failed or extraneous equipment, upgrading the dry valve in
G76 which serves the dry sprinkler system at the loading
dock, and replacing the fire pump controller. | |||||
Submit To | Facilities Management- Attn: Attila Gergely
University of North Carolina at Charlotte - Building 55
9201 University City Boulevard
Charlotte NC 28223
704-687-0522 |