Construction Manager-at-Risk Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||||
Project Name | Bureau of Mines Renovation | |||||
Project Manager | Bob Cwikla | |||||
Phone Number | (919) 515-6836 | |||||
Contact Email | rmcwikla@ncsu.edu | |||||
Pre-proposal Date | 03/22/2017 | |||||
Pre-proposal Time | 1:00 pm | |||||
Pre-proposal Location | 2017 in Room 301 of the Administrative Services III Building located at 2701 Sullivan Drive | |||||
Closing Date | 04/05/2017 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Construction Manager at Risk (CMR) services are needed to
renovate the 16,817 gross square foot (GSF) Bureau of Mines
building built in 1945. The project will remove a partial
mezzanine and construct a new interstitial floor for a total
of four floors to house the Dean and administrative offices
of the College of Sciences. The renovation will correct
building system deficiencies (fire suppression, HVAC,
electrical, plumbing) and asbestos abatement. ADA
compliance as well as building code and State Energy Code
issues will also be addressed. The original single-glazed
windows will be replaced and exits reconfigured. A new entry
along Stinson Drive shall be created to mitigate the grade
change and will include the installation of a new elevator.
The design shall reinforce the University's desire to
create an open environment to foster collaboration and
highlight the original structure. | |||||
Submit To | North Carolina State University
Bob Cwikla, Project Manager
Capital Project Management
2701 Sullivan Drive
Administrative Services III
Suite, 331
Campus Box 7520
Raleigh, NC 27695 |