Opportunities to Do Business with the Universities

Construction Manager-at-Risk Solicitations

Full Details

 Institution NC State University 
 Institution URL for Additional
Information about this Project (Optional)
 https://facilities.ofa.ncsu.edu/category/ads/ 
 Project Name Bureau of Mines Renovation 
 Project Manager Bob Cwikla 
 Phone Number (919) 515-6836 
 Contact Email rmcwikla@ncsu.edu 
 Pre-proposal Date 03/22/2017 
 Pre-proposal Time 1:00 pm 
 Pre-proposal Location 2017 in Room 301 of the Administrative Services III Building located at 2701 Sullivan Drive 
 Closing Date 04/05/2017 
 Project Budget 
$6,000,000
 
 Project Description One-Two Sentences
Construction Manager at Risk (CMR) services are needed to renovate the 16,817 gross square foot (GSF) Bureau of Mines building built in 1945. The project will remove a partial mezzanine and construct a new interstitial floor for a total of four floors to house the Dean and administrative offices of the College of Sciences. The renovation will correct building system deficiencies (fire suppression, HVAC, electrical, plumbing) and asbestos abatement. ADA compliance as well as building code and State Energy Code issues will also be addressed. The original single-glazed windows will be replaced and exits reconfigured. A new entry along Stinson Drive shall be created to mitigate the grade change and will include the installation of a new elevator. The design shall reinforce the University's desire to create an open environment to foster collaboration and highlight the original structure.
 
 Submit To 
North Carolina State University Bob Cwikla, Project Manager Capital Project Management 2701 Sullivan Drive Administrative Services III Suite, 331 Campus Box 7520 Raleigh, NC 27695