Construction Manager-at-Risk Solicitations
Full Details
Institution | UNC Asheville | |||||
Institution URL for Additional Information about this Project (Optional) | https://drive.google.com/folderview?id=0B9y527K4uxOhTERERkZzRzZjanM&usp=sharing | |||||
Project Name | Owen Hall & Carmichael Hall Renovation | |||||
Project Manager | Thomas Baldwin | |||||
Phone Number | ||||||
Contact Email | tbaldwin@unca.edu | |||||
Pre-proposal Date | 06/02/2016 | |||||
Pre-proposal Time | 2:00 pm | |||||
Pre-proposal Location | Owen Hall Room 113 | |||||
Closing Date | 06/21/2016 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences Renovate and revitalize Owen Hall and Carmichael Hall, two
buildings on UNC Asheville's campus that have been in
continuous use for 36 years and 49 years respectively, with
no major renovations or improvements. Both buildings'
architectural, mechanical, plumbing and electrical systems
are well past their normal life expectancy. Owen Hall does
not have fire sprinklers and the heating and air
conditioning systems do not comply with current standards
for health and comfort. The building's bathrooms,
elevator, student art studios, art patio, and fixed seating
classrooms do not meet the current Federal ADA Standards or
the North Carolina Accessibility Code. Carmichael Hall has
safety hazards throughout the building. For example, the
fire stairs do not meet current life safety requirements as
they exit to the interior of the building. The building does
not have fire sprinklers and the heating and air
conditioning systems do not comply with current standards
for health and comfort. The building fire alarm system is
outdated and is not addressable. Carmichael Hall's
bathrooms and elevator do not meet the current Federal ADA
Standards or the North Carolina Accessibility Code. | |||||
Submit To | Submit 15 sheets (30 pages maximum) with 3 paper copies and
one file on flash drive to:
Terri Dixon
UNC Asheville
One University Heights, CPO 1110
Asheville, NC 28804 |