Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution Appalachian State University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Winkler Hall Demolition 
 Prequalifying for 
Demolition and complete removal of 11 story building with about 68,000 SF, and steel frame, concrete floors CMU and sheetrock interior walls and brick veneer. Use of explosives and implosion are acceptable. Asbestos abatement will be completed separately and is not included in this scope.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm Falcon Engineering, Raleigh 
 Design Firm Contact Name Zachary Lyon 
 Design Firm Telephone Number (919) 871-0800 
 Design Firm Email zlyon@falconengineers.com 
 CM at Risk Firm Name  
 CM at Risk Firm Email  
 Campus Contact Email sweetdm@appstate.edu 
 Due Date 01/31/2014 
 Due Time 5:00 pm 
 Submit To 
Planning, Design and Construction Office Appalachian State University 438 Academy St. ASU P.O. Box 32050 Boone, NC 28608-2050