Construction Solicitations to Prequalify Contractors
Full Details
Institution | Winston-Salem State University | |||
Institution URL for Additional Information about this Project (Optional) | http://www.sametcorp.com/subcontractors/prequalification.aspx | |||
Project Name | Center for Design Innovation - (Phase II Vertical Construction bid pkgs) | |||
Prequalifying for | CDI Phase II Vertical Construction including: 02E Site
Concrete / Sidewalk, 02F Landscaping, 02G Special
Foundations, 03A Concrete Foundations, Walls & Slabs,
03B Precast Concrete Panels, 04A Masonry, 05A Structural
Steel (Furnish & Install), 06A Architectural Woodwork /
Millwork, 07A Waterproofing & Joint Seals, 07B Membrane
Roofing (TPO), 07C Spray Applied Fireproofing, 07E Fiber
Cement Siding, 08A Doors, Frames, Hardware, accessories
& Specialties (Furnish & Install), 08B Overhead /
Coiling Doors, 08C Aluminum Storefront, Curtain-wall, Glass
& Glazing, 09A Drywall, Metal Studs, Insulation and
Accoustical Ceilings, 09C Hard Tile Flooring, 09D Resilient
Tile & Carpet Flooring, 09E Painting, 09F Special
Flooring, 10A Visual Display Boards, Toilet Compt. &
Accessories(Furnish & Install), 10B Signage | |||
Main Contact for Submission | CM at Risk Firm | |||
Name of Design Firm | CJMW Architecture | |||
Design Firm Contact Name | Jeff Sowers | |||
Design Firm Telephone Number | (336) 724-1503 | |||
Design Firm Email | jeff.sowers@cjmw.com | |||
CM at Risk Firm Name | Samet Corporation/SRS, Inc., a joint venture company | |||
CM at Risk Firm Email | jsigers@srsincorp.com | |||
Campus Contact Email | vanardre@wssu.edu | |||
Due Date | 04/19/2013 | |||
Due Time | 5:00 pm | |||
Submit To | Prequalification documents and information for the Center
for Design Innovation project may be obtained and submitted
through the following link:
http://www.sametcorp.com/subcontractors/prequalification.aspx
or by contacting SSJV team member Johnny Sigers at
336-944-3012. |