Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | http://www.ncsu.edu/facilities/advertisements/index.htm | |||
Project Name | Laboratory for Analytical Sciences | |||
Prequalifying for | The project will renovate the third floor, approximately
17,000 SF, of Corporate Research I for a new, single tenant.
Renovations will be required to comply with the design and
construction standards set in ICD 705. Preliminary
demolition has been performed on the space, and new work
will include insulation and finishes on the exterior wall,
new interior partitions, doors, lighting, finishes, HVAC,
sprinkler system modifications, electrical, telecom,
security, and interior finishes. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Becker Morgan Group | |||
Design Firm Contact Name | Rick Collins | |||
Design Firm Telephone Number | (910) 341-7600 | |||
Design Firm Email | rcollins@beckermorgan.com | |||
CM at Risk Firm Name | NA | |||
CM at Risk Firm Email | NA | |||
Campus Contact Email | bill_davis@ncsu.edu | |||
Due Date | 04/12/2013 | |||
Due Time | 5:00 pm | |||
Submit To | To be considered, the contractor must obtain an application
package from the NC State University Project Manager and
submit a sealed, fully completed qualification document by
5:00 pm, April 12, 2013, to:
NC State University
Bill Davis, Project Manager,
Administrative Services Building III,
2701 Sullivan Dr., Suite 331, Campus Box 7520,
Raleigh, NC 27695-7520.
Application packages will be available electronically after
March 18, 2013. Please contact the project manager via
email (preferred) or phone to request a package. Three (3)
hard copies of completed qualification packages must be
submitted to the project manager. Completed qualification
packages will not be accepted electronically. |