Construction Solicitations to Prequalify Contractors
Full Details
| Institution | NC State University | |||
| Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/2026/03/request-for-general-contractor-prequalification-submittals-ligon-st-beryl-rd-water-line-improvements/ | |||
| Project Name | Ligon St -Beryl Rd Water Line Improvements - I-440 Widening | |||
| Prequalifying for | This project improves the domestic water service to the
Horticultural Field Labs (HFL) and the Dearstyne Complex by
extending a new water line service and connection from Beryl
Road and by installing a loop connection in existing piping
serving the Dearstyne Complex.
The project will also address domestic water pressure issues
experienced by the HFL since the West Campus was
disconnected from the Method Road pumping station as a
result of the I-440 widening. | |||
| Main Contact for Submission | Campus Contact | |||
| Name of Design Firm | RMF Engineering | |||
| Design Firm Contact Name | Daniel Craig | |||
| Design Firm Telephone Number | (919) 941-9876 | |||
| Design Firm Email | daniel.craig@rmf.com | |||
| CM at Risk Firm Name | ||||
| CM at Risk Firm Email | ||||
| Campus Contact Email | David Hammock | |||
| Due Date | 04/17/2026 | |||
| Due Time | 5:00 pm | |||
| Submit To | Receiving Email Submissions Only:
DC_Formal_Prequal@ncsu.edu
NC State University
David Hammock, PE
Project Manager
NC State Design and Construction
Email for questions only: david_hammock@ncsu.edu |