Opportunities to Do Business with the Universities
Designer Solicitations
Full Details
| Institution | UNC - Chapel Hill Academic Affairs | |||||
| Institution URL for Additional Information about this Project (Optional) | https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | Kenan Labs Renovation | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Andrew Rook | |||||
| Phone Number | (919) 962-7019 | |||||
| Contact Email | arook@unc.edu | |||||
| Closing Date | 12/17/2024 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences The scope of work involves an Advanced Planning Study
including full floor concept plans for the renovation of
Kenan Laboratories as described below as well as the
planning of a major systems renovation in support of
activities on floors Ground through 4. Built in 1968 and
located off South Road, Kenan Laboratories is a ten story,
140,410 sf teaching laboratory facility for the Chemistry
and Applied Physical Sciences Departments. An earlier
project, completed in 2019, renovated approximately 23,000
sf of laboratory and office space located on the 7th and 8th
floors. Significant infrastructure upgrades were also
completed at that time.
Lab Programming / Planning:
The Design team shall prepare an Advance Planning Study to
include the programming and planning of classroom, office,
and laboratory suites on the following floors, each subject
to re-distribution:
Ground Floor - Physical Chemistry Labs & Offices
Floor 1 - Classrooms & Offices
Floor 2 - Offices
Floor 3 - Inorganic Chemistry Labs (hood intensive)
Floor 4 - Inorganic & Organic Chemistry Labs (hood
intensive)
Floor 5 - Physical, Polymer & Analytical Labs (some hood
intensive)
Floor 6 - Analytical Labs (NOT hood intensive)
Mechanical, Plumbing, and Electrical Renovations and
Improvements:
The Design team shall also prepare an Advanced Planning
Study in anticipation of renovations to and replacement of
existing HVAC, Plumbing, and Electrical systems serving
floors Ground, 1, 2, 3, & 4. This shall include the
replacement of three original AHU's and the addition of
an emergency generator. The 2019 construction project
replaced three of the six original AHUs with new units
located on the roof, one AHU on each of the three buildings,
serving floors 5 and higher.
Design Services shall include: Architecture, Structural,
Mechanical, Electrical, Plumbing, Telecommunications, Fire
Alarm & Fire Protection. The design team shall prepare
SD, DD, and CD level documentation, including Life-cycle
Cost Analysis, Phasing & Construction Staging Plans. A
Cost Estimation firm shall be included with the team to
provide Project Budget Cost Analysis.
Current project authorization is for advance planning only.
The selected firm may be retained for full design and
construction at the university's option. | |||||
| Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Andrew Rook
Campus Planner | Project Manager
Facilities Planning & Design
UNC Chapel Hill
919.962.7019
arook@unc.edu |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.