Opportunities to Do Business with the Universities
Designer Solicitations
Full Details
| Institution | UNC Greensboro | |||||
| Institution URL for Additional Information about this Project (Optional) | https://facdc.uncg.edu/wp-content/uploads/20230420_Jackson-Library-Addition-and-Renovation_Cx-Services-Advertisement.pdf | |||||
| Project Name | Jackson Library Addition and Renovation Commissioning | |||||
| Type of Services | Commissioning | |||||
| Project Manager | T. O. (Buddy) Hale | |||||
| Phone Number | (336) 334-4431 | |||||
| Contact Email | tohale@uncg.edu | |||||
| Closing Date | 05/19/2023 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences The scope of this project will consist of a comprehensive,
transformative renovation to the existing building. The
Jackson Library opened in 1950, with the tower addition
coming online in 1973, and minimally updated since. The
current facility is not reflective of the evolving
definition of a modern-day library: a dynamic,
technology-rich learning environment and intellectual
community hub. Growth in enrollment, new academic programs
and library support activities have generated a need for an
increase in programmatic space and make it critical that the
existing spaces be renovated. The renovation will include
updating the existing mechanical, electrical, plumbing, life
safety and audiovisual systems. The project also includes
addressing ADA issues. Located at the bustling hub that is
the physical center of campus, the project is envisioned as
a complex, phased construction of an occupied building. As
such, implementation will require meticulous and proactive
planning. The project will integrate high technology group
studies, central convening spaces and increased capacity for
use by individual students. It is envisioned as a nexus of
student academic success and transformative research
resources. The library is considered at the core of the
University's intellectual space, where learning,
knowledge creation, and community are fostered.
Building Commissioning shall include the whole building, and
specifically may include the following systems:
A. Mechanical Systems - including applicable HVAC Systems,
local central plant cooling systems, and Testing, Adjusting,
and Balancing (TAB) validation.
B. Electrical Systems - including applicable lighting
systems, normal, standby, and emergency power systems, and
controls, including day lighting.
C. Plumbing Systems - including applicable potable hot water
systems, booster pump systems, and rainwater harvesting
water systems.
D. Irrigation Systems - including applicable coverage and
controls.
E. Building Envelope - Including air barriers, transition
and opening details, waterproofing, and roofing systems.
F. Evaluation of LEED Silver certification.
Letters of Interest due by 12:00 p.m. (noon) on 5/19/23 | |||||
| Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) T. O. (Buddy) Hale
UNCG Facilities Design and Construction
Gray Home Management House
105 Gray Drive, Greensboro, NC 27412
PO Box 26170, Greensboro, NC 27402-6170 |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.