Institution | UNC Greensboro | |||||
Institution URL for Additional Information about this Project (Optional) | https://fac.uncg.edu/wp-content/uploads/20250606_Campus-Steam-and-Condensate-CMR-Ad-Package.pdf | |||||
Project Name | Campus Steam & Condensate Infrastructure Improvements | |||||
Project Manager | Tim Rouse | |||||
Phone Number | (336) 334-4317 | |||||
Contact Email | tsrouse2@uncg.edu | |||||
Pre-proposal Date | 06/20/2025 | |||||
Pre-proposal Time | 2:00 pm | |||||
Pre-proposal Location | Via MS Teams Meeting -See URL for details | |||||
Closing Date | 07/18/2025 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences This project will replace and renew critical portions of the
existing steam distribution system. Project focus will be
on sections between Manhole(MH) #11 to MH #15, MH #54 to MH
#57, and piping between MH #27 to the Music Building/Peabody
Park Bridge, and possibly including the section from MH #15
to MH #17. All work will be integrated with the campus
automation system (BAS).
Construction is envisioned to be sequenced to limit overall
disruption to the highly visible and occupied portion of
central campus.
See link above for additional information about this project
and submission requirements.
All submissions should be sent electronically to
fdc@uncg.edu, and are due by 12 p.m. (noon) on July 18,
2025. | |||||