Construction Manager-at-Risk Solicitations

Full Details

 Institution UNC Greensboro 
 Institution URL for Additional
Information about this Project (Optional)
 https://fac.uncg.edu/wp-content/uploads/20250606_Campus-Steam-and-Condensate-CMR-Ad-Package.pdf 
 Project Name Campus Steam & Condensate Infrastructure Improvements 
 Project Manager Tim Rouse 
 Phone Number (336) 334-4317 
 Contact Email tsrouse2@uncg.edu 
 Pre-proposal Date 06/20/2025 
 Pre-proposal Time 2:00 pm 
 Pre-proposal Location Via MS Teams Meeting -See URL for details 
 Closing Date 07/18/2025 
 Project Budget 
$16,330,438
 
 Project Description One-Two Sentences
This project will replace and renew critical portions of the existing steam distribution system. Project focus will be on sections between Manhole(MH) #11 to MH #15, MH #54 to MH #57, and piping between MH #27 to the Music Building/Peabody Park Bridge, and possibly including the section from MH #15 to MH #17. All work will be integrated with the campus automation system (BAS). Construction is envisioned to be sequenced to limit overall disruption to the highly visible and occupied portion of central campus. See link above for additional information about this project and submission requirements. All submissions should be sent electronically to fdc@uncg.edu, and are due by 12 p.m. (noon) on July 18, 2025.
 
 Submit To 
Tim Rouse UNC Greensboro fdc@uncg.edu tsrouse2@uncg.edu