Opportunities to Do Business with the Universities
Construction Manager-at-Risk Solicitations
Full Details
| Institution | UNC - Chapel Hill Academic Affairs | |||||
| Institution URL for Additional Information about this Project (Optional) | https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | Avery Residence Hall - Renovations | |||||
| Project Manager | Quade T Gallagher | |||||
| Phone Number | (984) 484-4113 | |||||
| Contact Email | quadeg@unc.edu | |||||
| Pre-proposal Date | 08/10/2023 | |||||
| Pre-proposal Time | 3:00 pm | |||||
| Pre-proposal Location | Avery Residence Hall 295 Ridge Rd, Chapel Hill, NC 27514 | |||||
| Closing Date | 08/25/2023 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences The existing Avery Residence Hall is an existing five story
residence hall located on Ridge Road at the end of Stadium
Drive on the UNC-CH campus. The project includes a 4860
Gross Square Foot (GSF) addition to the existing building
along with renovations and repairs. The existing building is
approximately 63,600 GSF.
The scope of site improvements at the front of the building
includes creating an accessible path from the front entrance
directly to the sidewalk at Ridge Road and a new drop off
drive for Point-To-Point transit. At the back of the
building and at the new addition, the site improvements will
consist of a new accessible path from the street crossing to
the west of Avery to the backside of the building up to the
new addition, which will connect Avery to the north end of
the campus. Other site and utility improvements include new
domestic water service and backflow preventer, new storm
drainage system, new landscaping and plantings, new sanitary
connections, new chilled water connections, new service
transformer, among others.
The ground floor of the building will consist of a renovated
office suite for Carolina's housing use, along with new
facilities for the building ??? laundry, storage,
mechanical, electrical rooms, etc. Floors 1-4 of the
existing building will be renovated to have two new
accessible suits that stack on all floors. The renovation
scope will also include all existing windows being replaced,
HVAC improvements, roof repairs, abatement, etc. The new
addition will include a new elevator for vertical
circulation, egress stair, and study rooms.
The project will be designed and constructed to University
goals of environmental sustainability as set out in the UNC
Climate Action Plan.
Advanced Planning concluded on February 6, 2023, and a
Schematic Design submission to SCO was on June 28, 2023.
Renovations to the existing building are expected to be
completed by July 17, 2025 so that Carolina Housing can have
beneficial occupancy for all residence rooms. The final
stages of construction of the addition could extend into the
fall semester of 2025 if need be. | |||||
| Submit To | Quade T Gallagher
quadeg@unc.edu |