Project Name | Central Campus Electrical Upgrade Phase 2 - Distribution | |||
Prequalifying for | The project scope includes installation of new 15kV
distribution to include underground ductbank, cables,
manholes, and switchgear.
To qualify, the contractor must have a general or an
unlimited electrical contractor's license in the State
of North Carolina as well as applicable bonding
requirements.
The contractor must show comparable work experience, both in
complexity and dollar value, and preferably in a University
campus environment, to the scope of work outlined above. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | ||||
Design Firm Contact Name | ||||
Design Firm Telephone Number | (817) 840-2873 | |||
Design Firm Email | jhardin@burnsmcd.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | ||||
Campus Contact Email | dllallat@ncsu.edu | |||
Due Date | 12/13/2019 | |||
Due Time | 5:00 pm | |||
Submit To | To be considered, the contractor must obtain an application
package, downloaded from the following link:
http://facilities.ofa.ncsu.edu/category/ads/ and submit
three (3) sealed, fully completed qualification documents by
5:00 PM, 12/13/19, to
Damian Lallathin, project manager, at Administrative
Services Building III, 2701 Sullivan Dr., Suite 331, NCSU,
Campus Box 7520, Raleigh, NC 27695-7520. Completed