Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution NC State University 
 Institution URL for Additional
Information about this Project (Optional)
 http://facilities.ofa.ncsu.edu/category/ads/ 
 Project Name Winston Hall HVAC Renovations 
 Prequalifying for 
The general contractor shall remove the existing cooling only air handlers, shut-off VAV boxes, baseboard radiant heaters, pneumatic controls, steam to hot water converter, hot water pump, and other associated piping and equipment. The contractor shall then install new heating and cooling air handlers, reheat VAV boxes, steam to hot water converter, hot water pump, building automation system, connection to the campus automation system, and other piping, mechanical, and electrical components.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm Apogee Consulting Group 
 Design Firm Contact Name John Mathews 
 Design Firm Telephone Number (919) 838-7628 
 Design Firm Email jmathews@acg-pa.com 
 CM at Risk Firm Name Not Applicable 
 CM at Risk Firm Email Not Applicable 
 Campus Contact Email Steven R. Bostian 
 Due Date 08/13/2015 
 Due Time 5:00 pm 
 Submit To 
Steven R. Bostian, PE NC State University Capital Project Management 2701 Sullivan Drive Suite 331 Raleigh, NC 27695 Please contact Steve Bostian at srbostia@ncsu.edu to request a general contractor pre-qualification package. Only one (1) pre-qualification package is required. The pre-qualification package must be received by 5 PM on August 13, 2015 to be considered. No electronic packages will be considered.