 Project Name Ricks Hall 3rd Floor and Utilities Upgrades Project 
 Prequalifying for 
This project will demolish the existing offices and associated materials for approximately two-thirds of the 9,866 SF 3rd Floor. The project will then rebuild offices in this space including the associated walls, doors, painting, finishing, carpeting, electrical power conduit and receptacles, data and telephone conduit and receptacles, electrical lighting, fire protection piping and sprinkler heads, and install HVAC ductwork, steam, condensate, and chilled water supply and return piping, a 19,000 CFM AHU in the basement, waterproofing of the below grade exterior basement walls, and new windows throughout the building exterior.
 
 Main Contact for Submission Campus Contact 
 Name of Design Firm HH Architecture 
 Design Firm Contact Name Kristen Hess 
 Design Firm Telephone Number (919) 828-2301 
 Design Firm Email khess@hh-arch.com 
 CM at Risk Firm Name Not Applicable 
 CM at Risk Firm Email Not Applicable 
 Campus Contact Email Steven R. Bostian 
 Due Date 05/30/2014 
 Due Time 5:00 pm 
 Submit To 
Steven R. Bostian, PE NC State University Capital Project Management Dept. 2701 Sullivan Drive Suite 331 Raleigh, NC 27695 Pre-qualification packages can be requested from Steve Bostian beginning Monday, May 5, 2014. Three hard copies of the submittal will be required. Completed qualification packages will not be accepted electronically. Copies delivered after 5 PM will not be received/ accepted.