Construction Solicitations to Prequalify Contractors
Full Details
Institution | UNC - Chapel Hill Academic Affairs | |||
Institution URL for Additional Information about this Project (Optional) | http://fpc.unc.edu/Projects/FirmProfileLogin.aspx | |||
Project Name | Main Campus Electrical Duct Bank Improvements | |||
Prequalifying for | This project involves the installation of a 15kV electric
duct bank in two areas on the University of North Carolina
at Chapel Hill Campus. The aprroximate overall ductbank
length is 450 feet. Pre-cast manholes, switch pads, and
rigid conduit thru a building crawl space is also included
in this project. This will qualify for the duct bank
construction and associated work only; the majority of
cabling, terminations, and equipment, unless otherwise
specified, will be provided by the owner outside of this
contract. Project Estimated Construction Budget: $750,000.
Construction Schedule: Construction activities are expected
to start in Summer 2013 with a duration of 60 consecutive
calendar days. | |||
Main Contact for Submission | Design Firm | |||
Name of Design Firm | RMF Engineering, Inc. | |||
Design Firm Contact Name | Cheryl Piner, PE | |||
Design Firm Telephone Number | (919) 941-9876 | |||
Design Firm Email | cheryl.piner@rmf.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | ||||
Campus Contact Email | mkonishi@fac.unc.edu | |||
Due Date | 02/27/2013 | |||
Due Time | 3:00 pm | |||
Submit To | Applications for pre-qualification will be due no later than
3:00pm, February 27, 2013. Pre-qualification forms may be
obtained by contacting Cheryl Piner, PE at RMF Engineering
Inc, telephone (919)941-9876, cheryl.piner@rmf.com.