Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution UNC - Chapel Hill Academic Affairs 
 Institution URL for Additional
Information about this Project (Optional)
 http://fpc.unc.edu/Projects/FirmProfileLogin.aspx 
 Project Name Main Campus Electrical Duct Bank Improvements 
 Prequalifying for 
This project involves the installation of a 15kV electric duct bank in two areas on the University of North Carolina at Chapel Hill Campus. The aprroximate overall ductbank length is 450 feet. Pre-cast manholes, switch pads, and rigid conduit thru a building crawl space is also included in this project. This will qualify for the duct bank construction and associated work only; the majority of cabling, terminations, and equipment, unless otherwise specified, will be provided by the owner outside of this contract. Project Estimated Construction Budget: $750,000. Construction Schedule: Construction activities are expected to start in Summer 2013 with a duration of 60 consecutive calendar days.
 
 Main Contact for Submission Design Firm 
 Name of Design Firm RMF Engineering, Inc. 
 Design Firm Contact Name Cheryl Piner, PE 
 Design Firm Telephone Number (919) 941-9876 
 Design Firm Email cheryl.piner@rmf.com 
 CM at Risk Firm Name  
 CM at Risk Firm Email  
 Campus Contact Email mkonishi@fac.unc.edu 
 Due Date 02/27/2013 
 Due Time 3:00 pm 
 Submit To 
Applications for pre-qualification will be due no later than 3:00pm, February 27, 2013. Pre-qualification forms may be obtained by contacting Cheryl Piner, PE at RMF Engineering Inc, telephone (919)941-9876, cheryl.piner@rmf.com. Submit to: Ms. Cheryl Piner RMF Engineering, Inc. 8081 Arco Corporate Drive Suite 300 Raleigh, NC 27617