Designer Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||||
Project Name | Morrill Drive and Phase II Campus-Wide Domestic Water Line Replacement | |||||
Type of Services | Civil/Structural Engineering | |||||
Project Manager | David Hammock | |||||
Phone Number | (919) 515-2030 | |||||
Contact Email | david_hammock@ncsu.edu | |||||
Closing Date | 05/20/2024 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences This phased project replaces approximately 1800 feet of
1960s vintage 8" cast iron water main with 12"
ductile iron, and includes replacing hydrants. The scope is
from Jordan Hall (Faucette Drive) to Morrill Drive and then
along Morrill Drive to Rocky Branch Creek. The second
project phase will replace approximately 800 feet of 1925
vintage 6" cast iron water main in Broughton Drive. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) David Hammock, PE
NC State University
Design and Construction
david_hammock@ncsu.edu |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.