Designer Solicitations
Full Details
Institution | NC State University | |||||
Institution URL for Additional Information about this Project (Optional) | http://facilities.ofa.ncsu.edu/category/ads/ | |||||
Project Name | Daniels Hall Roof Replacement | |||||
Type of Services | Engineering/Architectural | |||||
Project Manager | Greg Selzer | |||||
Phone Number | (919) 795-1601 | |||||
Contact Email | gjselzer@ncsu.edu | |||||
Closing Date | 10/20/2017 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences The project will remove all existing roofing membranes,
separation layers, LG boards and insulation down to the roof
deck, and provide and install a new roof membrane and
insulation system. Rework of existing exhaust fans, plumbing
vents, and other roof penetrations is required. The existing
non-penetrating guard rails will be temporarily removed and
reinstalled. Note: NC State's Building Maintenance
& Operations personnel will remove the abandoned
existing cooling tower and former penthouse observatory
frame, and replace the existing RTU as a separate project. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Greg Selzer, Project Manager
NC State University
Capital Project Management
2701 Sullivan Drive
Raleigh, NC 27695-7520
A Pre-submittal Meeting will be held October 6th at 1:00 pm
in Conference Room 301, Administrative Services III, 2701
Sullivan Drive on the NC State campus. Attendance is
encouraged but not mandatory.
Parking is available in the pay-lot adjacent to the West
Deck parking across the street from Admin III. |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.