Designer Solicitations
Full Details
Institution | UNC Charlotte | |||||
Institution URL for Additional Information about this Project (Optional) | https://facilities.uncc.edu/ | |||||
Project Name | SAC & Barnard Chiller/HVAC Replacement | |||||
Type of Services | Engineering | |||||
Project Manager | Rick Ellis | |||||
Phone Number | (704) 687-0517 | |||||
Contact Email | reellis@uncc.edu | |||||
Closing Date | 09/16/2014 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences HVAC work in Barnard will include, but not be limited to,
air handling unit replacements, CRAC units serving specialty
areas, terminal reheat boxes replacement with VAV reheat,
replace all HW/CW piping and retrofit lighting in Mechanical
Room. The scope will also include upgrade of lighting
systems for energy efficiency and replacement of the
existing pneumatic control system with a new DDC system tied
into the campus-wide Building Automation System (BAS).
At the Student Activity Center (SAC) the work entails
replacing the two existing 500 nominal ton water cooled
chillers with one 800 ton high efficiency water-cooled
chiller complete with new primary pump package. Existing
chillers were installed in 1994. | |||||
Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Joyce Clay
University of North Carolina at Charlotte
Capital Projects
Facilities Management
9201 University City Boulevard
Charlotte, N.C. 28223-0001
Or hand delivered to:
Attn: Joyce Clay
Facilities Management/Police Building, 2nd Floor - Capital
Projects
9151 Cameron Blvd.
(Building #55 on the campus map) |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.