Construction Manager-at-Risk Solicitations
Full Details
Institution | East Carolina University | |||||
Institution URL for Additional Information about this Project (Optional) | https://campusoperations.ecu.edu/feas/ | |||||
Project Name | Whichard Building Comprehensive Renovation | |||||
Project Manager | Gina Shoemaker | |||||
Phone Number | (252) 328-6858 | |||||
Contact Email | battenm@ecu.edu | |||||
Pre-proposal Date | 01/25/2023 | |||||
Pre-proposal Time | 2:00 pm | |||||
Pre-proposal Location | 1001 East 4th St. Greenville, NC 27858 | |||||
Closing Date | 02/09/2023 | |||||
Project Budget |
| |||||
Project Description | One-Two Sentences East Carolina University intends to comprehensively renovate
the Whichard Building, completing all needed abatement,
removing all interior walls, stairs, mechanical, plumbing,
and electrical systems and rebuild to meet current codes.
Additionally, this project will add an elevator to serve the
second-floor levels of both the original building and annex.
The exterior breezeway and stair will be demolished, and a
building addition will enclose the connection between the
two structures with conditioned space. | |||||
Submit To | Gina Shoemaker, PE
ECU Facilities Engineering and Architectural Services
1001 East 4th St.
Greenville, NC 27858 |