| Bidding from prequalified firms on | | The Work of this project will consist of, but not be limited
to, the renovation of approximately 10,500 sf existing shell
space on the first floor of Murray Hall. The program will
primarily be comprised of the following areas; Applied
Physical Science research laboratories and support spaces,
offices, conference room, lounge/coffee bar area, student
workrooms, wood working, metal working, electronics, digital
fabrication, classroom, and circulation. The Work will
include demolition, interior finishes, HVAC, plumbing,
electrical, fire alarm, and sprinkler. The estimated
construction contract cost is $2.8 million.
The following General Contractors have been pre-qualified to
bid this job: ACH Constructors, LLC; Bordeaux Construction
Company, Inc.; D.A. Everett Construction Group; H.M. Kern
Corporation; Monteith Construction Corporation; Riley
Contracting Group.
All Documents may be obtained by or reviewed at BHDP
Architecture, 150 Fayetteville Street, Suite 820, Raleigh,
NC 27601
A mandatory public Pre-Bid meeting and site visit will be
held for all interested bidders at 1:00 pm on July 8, 2015
beginning in the Kenan Science Library, G301 Venable Hall,
CB# 3290, UNC-Chapel Hill, NC 27599-3290. The meeting will
address project specific questions. | |
| Bid Location | | Magnolia Conference Room (Giles Horney Building Room 100A),
at 103 Airport Drive, Chapel Hill, NC 27599
Mailing address:
UNC Chapel Hill
Facilities Planning and Design
103 Airport D., Suite 202
Campus Box 1090
Chapel Hill, NC 27599 | |