| Bidding from prequalified firms on | | The University is only accepting bids from prequalified
bidders.
Complete plans and specifications for this project can be
obtained by Prequalified Bidders from Davis Kane Architects,
503-300 Oberlin Road, Raleigh, NC 27605 during normal office
hours.
Plan Deposit is $100.
Plans and specifications are also available for review at
the ECSU Design & Construction Office in Dixon Hall,
during regular business hours, Monday through Friday, 8 a.m.
to 5 p.m
An open Pre-Bid Conference will be held at the Conference
Room in Griffin Hall, Viking Drive, Elizabeth City, NC 27909
at 11:00 am on Thursday, March 21, 2013. Interested vendors
and bidders are also invited to attend an open meeting to
identify preferred brand alternates that the Owner will
consider for approval on the project. The proposed preferred
brand alternate G-2 for door hardware are the following
manufacturer's products: locks to be by Corbin Russwin;
exit devices and power supply to be by Von Duprin; door
closers to be by LCN; power operators to be by LCN.
| |