Construction Solicitations to Prequalify Contractors
Full Details
| NC State University | ||||
| https://facilities.ofa.ncsu.edu/2026/06/request-for-general-contractor-prequalification-submittals-whole-building-backup-power-avent-ferry-technology- | ||||
| Whole Building Backup Power- Avent Ferry Technology Center (Re-Advertisement) | ||||
North Carolina State University is seeking qualification
statements from electrical contractors with an Unlimited
Electrical Contractor's license and a North Carolina
General Contractor's License, or General Contractors
with an Unlimited License for whole building standby power
at the Avent Ferry Technology Center. Project scope
includes required site work, generator screening wall, and
installation of a 500-kw generator, panelboard, ATS and MTS
procured by NCSU.
The budget of $800,000 incorporates design, construction,
fees and associated construction costs.
Application packages will be available electronically after
June 29, 2026. | ||||
| Campus Contact | ||||
| NV5 Engineers and Consultants | ||||
| Zaki Ahmad Daniyal, PE | ||||
| Design Firm Telephone Number | (919) 695-4210 | |||
| Zaki.Daniyal@nv5.com | ||||
| mebaker@ncsu.edu | ||||
| 07/16/2026 | ||||
| Due Time | 5:00 pm | |||
A qualification application document must be submitted by
5:00PM, July 16, 2026 to Michael Baker, project manager, by
email only to mebaker@ncsu.edu and
DC_Formal_Prequal@ncsu.edu.
No hard copies shall be submitted. |