Construction Solicitations to Prequalify Contractors

Full Details

 Institution NC State University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Kitchen Renovation - Wendell H. Murphy Football Center 
 Prequalifying for 
the following subcontractor bid packages: BP2 Selective Demolition BP3 Concrete BP6 Architectural Millwork/Casework BP7 Membrane Roofing BPA Doors & Hardware BP8B Glass & Glazing BP9A Metal Stud Framing/Gypsum Systems BP9B Acoustical Ceilings BP9C Ceramic Tiling BP9D Carpet & Resilient Flooring BP9E Painting & Wallcovering BP9F Window Shades BP10A Specialities BP10B Signage BP10C Final Cleaning BP10D General Trade & Construction Cleaning BP11 Food Service Equipment BP21 Fire Protection BP22 Plumbing BP23 Mechanical BP26A Electrical BP28A Fire Alarm
 
 Main Contact for Submission CM at Risk Firm 
 Name of Design Firm  
 Design Firm Contact Name Brandon Boyer 
 Design Firm Telephone Number (919) 683-1701 
 Design Firm Email bboyer@shelcollc.com 
 CM at Risk Firm Name Shelco-Right Build 
 CM at Risk Firm Email bboyer@shelcollc.com 
 Campus Contact Email  
 Due Date 06/02/2025 
 Due Time 5:00 pm 
 Submit To 
projectcompliance@rightbuildint.com