| | Project Description | | One-Two Sentences
A Non-Mandatory Pre-Proposal Meeting will be held for the
Student Health Building Counseling Services &
Respiratory Clinic Project on Thursday, May 21, 2026, at
10:00 am. The Pre-Proposal meeting will be held at:
NC Central University
Hubbard-Totton Building
Planning Room, First Floor, Room #113
105 Eagle Campus Drive
Durham, NC 27707.
SCOPE OF WORK: This project includes, but is not limited to,
interior renovations on the south side of the building,
including the medical counseling office, public restroom,
and the purchase and installation of window HVAC units on
the first and second floors, which will include electrical
power. The north side of the building will include some
electrical power upgrades to support the existing window
HVAC units in place. The electrical work will include
installing dedicated circuits within a new subpanel that
will support the north and south sides of the building. The
renovation will also include all associated demolition,
electrical work, new ceiling tiles, lighting upgrades, some
environmental testing and abatement, repairs to existing
plaster walls, and painting of walls to a Level 5 finish. | |