Opportunities to Do Business with the Universities
Designer Solicitations
Full Details
| Institution | UNC Pembroke | |||||
| Institution URL for Additional Information about this Project (Optional) | https://www.uncp.edu/info-for/external-vendors.html | |||||
| Project Name | Campus Gas Line Replacement - Construction Materials Testing and Special Inspections | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Matt Greene | |||||
| Phone Number | ||||||
| Contact Email | matt.greene@uncp.edu | |||||
| Closing Date | 05/26/2026 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences UNC Pembroke seeks a professional services firm to provide
Construction Materials testing and special inspections for
the replacement of a section of subsurface natural gas
piping. The Campus Gas Line Replacement project entails
replacing a section of the existing steel gas piping system
located between North Hall and Locklear Hall. The current
line is believed to be deteriorating, and it will be
upgraded to a corrosion-resistant High-Density Polyethylene
(HDPE) pipe. The new pipeline will generally follow the
existing alignment and will be designed to meet or exceed
the current system's capacity.
The University intends to select a qualified Special
Inspections firm through a qualifications-based review
process consistent with applicable SCO/SBC procedures. The
University selection committee will evaluate submissions,
rank firms based on demonstrated qualifications, and proceed
with selection without conducting formal interviews.
Firms are requested to assure receipt of One (1) electronic
copy via email in PDF format to the project contact by Noon
on 05/26/2026 and Cc: david.locklearl@uncp.edu. The intended
schedule listed below is subject to change:
- Submission Due Date: May 26, 2026
- Committee Review: Week of May 26, 2026
- Firm Notification: Week of June 1, 2026
So that the selection process is as objective as possible,
from the date of this public announcement, do not contact
members of the Board of Trustees, Campus Officials, and
staff other than the project contact. All communications to
the project contact via email only, Matt.Greene@uncp.edu,
Cc: david.locklear@uncp.edu. | |||||
| Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Only electronic submissions will be accepted per the
instructions under Project Description. Please submit
Letters of Interest and Current SF-330 forms to:
UNC Pembroke
Facilities Planning, Design and Construction
Matt Greene, Project Manager
matt.greene@uncp.edu
and include a copy to David Locklear
david.locklear@uncp.edu |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.