Opportunities to Do Business with the Universities

Designer Solicitations

Full Details

 Institution UNC Pembroke 
 Institution URL for Additional
Information about this Project (Optional)
 https://www.uncp.edu/info-for/external-vendors.html 
 Project Name Campus Gas Line Replacement - Construction Materials Testing and Special Inspections 
 Type of Services Architectural/Engineering 
 Project Manager Matt Greene 
 Phone Number  
 Contact Email matt.greene@uncp.edu 
 Closing Date 05/26/2026 
 Project Budget 
$651,113
 
 Project Description One-Two Sentences
UNC Pembroke seeks a professional services firm to provide Construction Materials testing and special inspections for the replacement of a section of subsurface natural gas piping. The Campus Gas Line Replacement project entails replacing a section of the existing steel gas piping system located between North Hall and Locklear Hall. The current line is believed to be deteriorating, and it will be upgraded to a corrosion-resistant High-Density Polyethylene (HDPE) pipe. The new pipeline will generally follow the existing alignment and will be designed to meet or exceed the current system's capacity. The University intends to select a qualified Special Inspections firm through a qualifications-based review process consistent with applicable SCO/SBC procedures. The University selection committee will evaluate submissions, rank firms based on demonstrated qualifications, and proceed with selection without conducting formal interviews. Firms are requested to assure receipt of One (1) electronic copy via email in PDF format to the project contact by Noon on 05/26/2026 and Cc: david.locklearl@uncp.edu. The intended schedule listed below is subject to change: - Submission Due Date: May 26, 2026 - Committee Review: Week of May 26, 2026 - Firm Notification: Week of June 1, 2026 So that the selection process is as objective as possible, from the date of this public announcement, do not contact members of the Board of Trustees, Campus Officials, and staff other than the project contact. All communications to the project contact via email only, Matt.Greene@uncp.edu, Cc: david.locklear@uncp.edu.
 
 Submit Letters of Interest
and Current SF-330 to:
 (Contact Person, Name of Institution & Address)
Only electronic submissions will be accepted per the instructions under Project Description. Please submit Letters of Interest and Current SF-330 forms to: UNC Pembroke Facilities Planning, Design and Construction Matt Greene, Project Manager matt.greene@uncp.edu and include a copy to David Locklear david.locklear@uncp.edu
 

In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.