| | Project Description | | One-Two Sentences
A Pre-Proposal Meeting will be held for the Hubbard-Totton
Building Elevator Replacement project for Engineering
services on Wednesday, February 11, 2026, at 10:00 am. The
meeting will be held at:
NCCU
Hubbard-Totton Building
1801 Fayetteville Street
Planning Room, First Floor, Room #113
Durham, NC 27707
Summary Scope of Work:
Provide architectural, mechanical, electrical, plumbing, and
fire protection design documents to remove the existing
elevator at the Hubbard Totten Building and install a
refurbished elevator at the same location. The project
includes replacing the existing swing door with bi-fold
doors retracting into the hoist way and upgrading the
elevator to meet current NC Building Code and SCO
requirements.
Services include:
- Design Development to verify field conditions and
prepare preliminary plans
- Preparation of complete construction drawings and
specifications; submission to SCO for review
- Elevator and interior finish specifications, elevator
data, and AutoCAD floor plans (based on available drawings
or scanned PDFs)
- Probable cost estimates of design development and
construction document phases
- Construction administration, including pre-bid and
pre-construction meetings, submittal and RFI review, final
punch list, and project closeout documentation
Access to previously completed design plans will be made
available upon request. | |