Designer Solicitations
Full Details
| Institution | UNC Greensboro | |||||
| Institution URL for Additional Information about this Project (Optional) | https://fac.uncg.edu/wp-content/uploads/20260121_Quad-Duct-Bank_Ad4Designer.pdf | |||||
| Project Name | Quad Duct Bank - Emergency Generator Connection | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Bill Chatfield | |||||
| Phone Number | (404) 550-2060 | |||||
| Contact Email | wjchatfi@uncg.edu | |||||
| Closing Date | 02/24/2026 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences The project scope is to install the duct bank life safety
and optional standby power systems from the Weil/Winfield
generator to the seven (7) residence halls in the Quad
(Jamison, Coit, Bailey, Cotten, Hinshaw, Gray, Shaw).
Scope of work includes disconnects, transfer switches,
panels, etc. at the buildings. The generator was installed
in 2019 and was sized to accommodate the additional load
required. Designer is to provide the least intrusive
practical design. Construction completion is to be scheduled
no later than July 23, 2027. | |||||
| Submit Letters of Interest and Current SF-330 to: | (Contact Person, Name of Institution & Address) Letters of Interest must be submitted electronically in PDF
format no later than 12:00 pm (Noon), February 24, 2026.
Submit Letters of Interest to:
Bill Chatfield
UNC Greensboro
Facilities Design & Construction
fdc@uncg.edu |
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina.