| | Project Description | | One-Two Sentences
Submittals are due by 2:00 p.m. on November 12, 2025.
Controls
- All electrical work necessary to complete the project.
- Replace obsolete BAS controls with EcoStruxure graphic
front-end (Schneider Preferred).
- Replace sensors, flow meters. Original valves and
actuators.
Mechanical
- Replacement of the 300 Tons Chiller VFD.
- Installation of upstream power conditioner/power quality
units upstream of the chiller.
- Installation of Water Side economizer for the plant.
- Replace IT and Electrical Room RTU's.
- Replace all maintenance-prone primary and secondary
chilled and hot water pumps.
- Replace chemical controllers, pumps and probes, make up
water meter and Blowdown water meter, make up water valve
and actuators, Blowdown water valves and actuators.
- Replace refrigerant monitoring systems.
Electrical
- All other electrical work necessary to complete the
project. | |