Construction Manager-at-Risk Solicitations
Full Details
| Institution | UNC - Chapel Hill Academic Affairs | |||||
| Institution URL for Additional Information about this Project (Optional) | https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | Housing Renewal Phase 2 (Parker Teague Halls Demo & Replacement) | |||||
| Project Manager | Quade T Gallagher | |||||
| Phone Number | (984) 484-4113 | |||||
| Contact Email | quadeg@unc.edu | |||||
| Pre-proposal Date | 03/23/2026 | |||||
| Pre-proposal Time | 11:00 am | |||||
| Pre-proposal Location | https://unc.zoom.us/j/5653249938?omn=93917904388&from=addon | |||||
| Closing Date | 04/10/2026 | |||||
| Project Budget |
| |||||
| Project Description | One-Two Sentences To address increasing enrollment and the need to expand
existing housing stock, UNC Chapel Hill seeks to redevelop
the site of Parker and Teague Residence Halls on the main
campus. The current buildings house upperclass students in
semi-suites containing four bedrooms sharing a bathroom with
no common space within the suite. It is not predetermined if
the redevelopment will result in a single, new residence
hall or two separate buildings. The new residence hall(s)
will accommodate approximately 550 to 600 upperclass
residents in single and double rooms (likely in a similar
semi-suite configuration as the current buildings) and
should include both interior and exterior amenities.
A dining facility space is not anticipated to be part of
this project; however, there may be opportunities for
smaller scale shell space for an outside vendor, such as a
cafe.
The University is currently engaged in the planning and
design of several capital projects in close proximity to
this site, so the team selected for this project will need
to coordinate with the work of those other projects.
The project is approved to proceed with Advanced Planning.
The working budget for the project is $120 million, which
includes soft costs, construction, and escalation. The
project is currently in the Advanced Planning Phase, which
is anticipated to conclude in mid-May.
The project schedule is full occupancy by July 1st, 2030. | |||||
| Submit To | Note: (1) one electronic PDF file of the submittal is
required via email or share file. Please note that the
University's file size limit for attachments from
external emails is 50 MB. You will receive a confirmation
email once your submission has been received.
All submissions are required to follow the GSA SF-330 format
and adhere to the criteria stated in these instructions and
any subsequent addenda issued by the University.
Submissions shall be limited to 50 pages total. The file
name of the PDF shall be:
UNC-CH Parker Teague_CMR Qualifications Submission_[firm
name].
Submit to: Quade T Gallagher quade@unc.edu |