| | Project Name | | Howell Science Building North Comprehensive Renovation | |
| | Pre-proposal Location | | Virtual-request link from shueyl@ecu.edu | |
| | Project Description | | One-Two Sentences
The original 1969 complex consists of three separate towers
with connectors for a total of approximately 127,794 square
feet. The complex is composed of classrooms and offices,
but it functions primarily as a laboratory building. The lab
spaces are isolated and cannot sufficiently support open
collaborative lab research. Howell's utility systems
are near the end of their useful life. This project is
intended to address deferred maintenance throughout
including building systems, life safety, accessibility, code
compliance and abatement. The construction must be
completed in multiple phases as two of the towers will
always be occupied during construction requiring continuous
MEP and network service throughout the project. This
project's renovation in the North tower will require
sequencing/coordination to prevent adversely affecting
occupancy in other areas with an 18-month construction
duration. The scope of this project will also include flood
proofing the South tower lower level. | |
| | Submit To | | East Carolina University
Facilities Engineering & Architectural Services
1001 E. 4th St.
Greenville, NC 27858 | |