Construction Manager-at-Risk Solicitations

Full Details

 Institution East Carolina University 
 Institution URL for Additional
Information about this Project (Optional)
  
 Project Name Howell Science Building North Comprehensive Renovation 
 Project Manager LL Everett 
 Phone Number (252) 328-2005 
 Contact Email everettle@ecu.edu 
 Pre-proposal Date 01/24/2025 
 Pre-proposal Time 10:00 am 
 Pre-proposal Location Virtual-request link from shueyl@ecu.edu 
 Closing Date 02/14/2025 
 Project Budget 
$46,000,000
 
 Project Description One-Two Sentences
The original 1969 complex consists of three separate towers with connectors for a total of approximately 127,794 square feet. The complex is composed of classrooms and offices, but it functions primarily as a laboratory building. The lab spaces are isolated and cannot sufficiently support open collaborative lab research. Howell's utility systems are near the end of their useful life. This project is intended to address deferred maintenance throughout including building systems, life safety, accessibility, code compliance and abatement. The construction must be completed in multiple phases as two of the towers will always be occupied during construction requiring continuous MEP and network service throughout the project. This project's renovation in the North tower will require sequencing/coordination to prevent adversely affecting occupancy in other areas with an 18-month construction duration. The scope of this project will also include flood proofing the South tower lower level.
 
 Submit To 
East Carolina University Facilities Engineering & Architectural Services 1001 E. 4th St. Greenville, NC 27858