Construction Bid Solicitations from Prequalified Contractors
Full Details
| Winston-Salem State University | ||||
| https://www.wssu.edu/administration/finance-and-administration/facilities/design-and-construction/index.html | ||||
| Hauser Hall Renovation and Addition - Bid Package #2: Balance of Construction | ||||
Bid Package #2 - Balance of Construction:
WC08: Landscaping
WC11: Masonry & Foam Insulation
WC13: Ext Joint Sealants, Ext Wall Exp Joint &
Waterproofing
WC14: Roofing
WC18: Glass, Glazing, Storefront
WC20: Millwork/Casework
WC20B: Doors, Frames, Hardware
WC21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall
Panels, & Foam Insulation
WC23: Resilient Flooring, Carpet, Wood Flooring
WC24: Painting & Wall Coverings
WC25: Specialties:
- Marker Boards
- Signage
- Toilet Partitions
- Corner Guards
- Toilet Accessories
- Fire Protection Specialties
WC25D: Interior and Exterior Signage
WC25N: Rigging, Drapery, & Equipment
WC26: Fire Protection Sprinkler System
WC27: Mechanical (HVAC)
WC27A: Plumbing
WC27D: Test & Balancing
WC28: Electrical, Fire Alarm & Security
WC34: Progress Clean, Final Clean | ||||
| CM at Risk Firm | ||||
| Michael Graves | ||||
| Matt Messick | ||||
| Design Firm Telephone Number | (336) 725-1371 Ext: 0758 | |||
| mmessick@michaelgraves.com | ||||
| DA Everett + Christman | ||||
| Kim Neese | ||||
| CM at Risk Firm Telephone Number | (336) 333-2872 | |||
| kim.neese@christmanco.com | ||||
| Staci Manter | ||||
| Campus Contact Telephone | (336) 750-8954 | |||
| manters@wssu.edu | ||||
| 06/18/2026 | ||||
| Bid Time | 2:00 pm (Time Bids Will Be Opened) | |||
Opening Bid Location:
Winston-Salem State University
Design and Construction Office
1604 Lowery Street, Suite C
Winston-Salem, NC 27110
*Pre-bid meeting & walk through will occur on 05/28/2026
at 10am. Pre-bid is located on the combined Hauser and KR
Williams construction site at:
Winston-Salem State University
1475 Cromartie Street
Winston-Salem NC 27101.
The Construction Manager can provide additional details such
as parking and construction site access requirements. Please
note this is an active construction site.
Last day for questions is 06/05/26 at 4 pm to Kim Neese of
the CM at kim.neese@christmanco.com |