Construction Bids
Full Details
| UNC Asheville | ||||||
| https://tinyurl.com/3ut295f7 | ||||||
| Campus Gateways Phase 1 | ||||||
| Bolton & Menk, Inc. | ||||||
| Craig Letson, PLA | ||||||
| Design Firm Telephone Number | (704) 981-6967 | |||||
| Craig.Letson@bolton-menk.com | ||||||
| Mary Pohl | ||||||
| 04/23/2026 | ||||||
| Pre-Bid Time | 2:00 pm | |||||
| 05/06/2026 (Date Bids Will Be Opened) | ||||||
| Bid Time | 2:00 pm (Time Bids Will Be Opened) | |||||
The non-mandatory Pre-Bid meeting and the Bid Opening will
both be held at:
UNC Asheville
Sam Millar Facilities Complex
220 Campus Drive
Asheville, NC 28804
Room S208 | ||||||
Complete plans and specifications may be obtained from the Designer during normal office hours. |