Construction Solicitations to Prequalify Contractors
Full Details
Institution | UNC Wilmington | |||
Institution URL for Additional Information about this Project (Optional) | https://uncw.edu/facilities/aldermankingreno.html | |||
Project Name | Alderman Hall & King Hall Renovations Bid Packages | |||
Prequalifying for | Bid Packages: 01A General Trades; 01C Final Clean; 02A
Hazard Material Abatement; 02B Selective
Demolition; 03A Concrete; 04A Masonry; 06A Millwork; 07A
Roofing; 08A Storefront, Glass and Glazing;
08B Doors, Frames, Hardware Installation; 08C Doors, Frames,
Hardware - Interior and Exterior; 09A
Drywall and Framing; 09B Flooring; 09C Ceramic Tile; 09D
Acoustical Ceiling; 09D Painting; 10A
Specialties; 10B Signage; 22B Plumbing; 23B HVAC Equipment
and Installation; 26A Electrical; 27A
Communications; 28A Fire Alarm.
HUB Outreach Event on December 6 at 4:00pm via ZOOM.
https://us06web.zoom.us/j/84145352528
Prequalification packages can be obtained by visiting:
https://www.muterconstruction.com/prequalify-for-cmr-projects | |||
Main Contact for Submission | CM at Risk Firm | |||
Name of Design Firm | Moseley Architects | |||
Design Firm Contact Name | Barbara Boykin | |||
Design Firm Telephone Number | (919) 404-8330 | |||
Design Firm Email | bboykin@moseleyarchitects.com | |||
CM at Risk Firm Name | Muter Construction | |||
CM at Risk Firm Email | gdriver@muterconstruction.com | |||
Campus Contact Email | holsingerd@uncw.edu | |||
Due Date | 12/21/2022 | |||
Due Time | 5:00 pm | |||
Submit To | Muter Construction
Preconstruction
111 E. Vance Street
Zebulon, NC 27597 |