Opportunities to Do Business with the Universities

Construction Solicitations to Prequalify Contractors

Full Details

 Institution UNC Charlotte 
 Institution URL for Additional
Information about this Project (Optional)
 http://facilities.uncc.edu/advertisements 
 Project Name Science Building Early Package 2 - Regional Utility Plant, Data Center and Site 
 Prequalifying for 
Balfour Beatty, the Construction Manager at Risk for this project is seeking to prequalify 1st Tier Subcontractors for the following trade packages; 01B Final Cleaning, 02A Demolition & Abatement, 03A Concrete, 04A Masonry, 05A Structural Steel /Misc Metals, 07A Waterproofing/Caulking, 07B Roofing, 08A Doors/Frames/Hardware, 08C Overhead Doors, 08D Louvers, 09G Painting, 21A Fire Protection, 22A Plumbing, 23A HVAC, 23B Test & Balance, 26A Electrical, 31A Sitework
 
 Main Contact for Submission CM at Risk Firm 
 Name of Design Firm ClarkNexsen 
 Design Firm Contact Name Michael Romot 
 Design Firm Telephone Number (704) 377-8800 
 Design Firm Email mromot@clarknexsen.com 
 CM at Risk Firm Name Balfour Beatty Construction 
 CM at Risk Firm Email ahughes@balfourbeattyus.com 
 Campus Contact Email dschauble@uncc.edu 
 Due Date 05/18/2018 
 Due Time 5:00 pm 
 Submit To 
Balfour Beatty Construction Attn: Annie Hughes 1930 Camden Road, Suite 280 Charlotte, NC 28203 (704) 295-4741 ahughes@balfourbeattyus.com