Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | DH Hill Towers and Poe Hall Waterproofing Project | |||
Prequalifying for | The DH Hill North Tower, the DH Hill South Tower, and the
Poe Hall Exterior are all experiencing waterproofing and
leaking issues at expansion joints, control joints, windows,
doors, masonry-to-masonry joints, and masonry-to-metal
joints. This project will remove all existing caulking and
backer rods from these interfaces, clean all surfaces of
dirt, paint, and oils, prime all joints, seal all
interfaces, re-caulk all interfaces, reseal all joints and
seams, and repoint masonry where necessary. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | SKA Consulting Engineers | |||
Design Firm Contact Name | Kirk Stanford | |||
Design Firm Telephone Number | (919) 855-0993 | |||
Design Firm Email | Kastanford@skaeng.com | |||
CM at Risk Firm Name | Not Applicable | |||
CM at Risk Firm Email | Not Applicable | |||
Campus Contact Email | srbostia@ncsu.edu | |||
Due Date | 01/26/2018 | |||
Due Time | 5:00 pm | |||
Submit To | Steven R. Bostian, PE
North Carolina State University
Capital Project Management
Administrative Services III Building
2701 Sullivan Drive
Raleigh, NC 27695-7520
Please go to the NC State University webpage for further
information. The electronic pre-qualification file will be
available on or after January 4, 2018 by contacting Steven
Bostian, the NC State Project Manager at 919-515-8059 or via
email at srbostia@ncsu.edu. |