Construction Solicitations to Prequalify Contractors
Full Details
Institution | NC State University | |||
Institution URL for Additional Information about this Project (Optional) | https://facilities.ofa.ncsu.edu/category/ads/ | |||
Project Name | Water Line Replacement | |||
Prequalifying for | This project will replace original cast-iron piping and
lateral connections to Syme, Gold, Welch, and Bragaw
Residence Halls, as well as Kamphoefner and Brooks Halls
with ductile iron-mortar lined piping. The project also
includes connecting the water main between University
College Commons and Carmichael Gym eliminating two dead end
portions. | |||
Main Contact for Submission | Campus Contact | |||
Name of Design Firm | Draper Aden Associates | |||
Design Firm Contact Name | Tyrus Clayton | |||
Design Firm Telephone Number | (919) 827-0864 | |||
Design Firm Email | tclayton@daa.com | |||
CM at Risk Firm Name | ||||
CM at Risk Firm Email | ||||
Campus Contact Email | david_hammock@ncsu.edu | |||
Due Date | 11/28/2017 | |||
Due Time | 5:00 pm | |||
Submit To | NC State University
David Hammock, PE
Administrative Services Building III
2701 Sullivan Dr., Suite 331
Campus Box 7520
Raleigh, NC 27695-7520 |